Princeton Digital Group · Bukit Batu, Malaysia
operating
- Facility power
- 52 MW
- PUE
- 1.4
- Cooling
- N+1 water-cooled chiller system
- Renewable energy
- planned-onsite-solar
- Building area
- 170,000 m²
- Year
- 2024
+1 more attribute on this record
Asia
118 facilities across 43 cities and 54 operators. Every value comes from a named public page, and capacity that is announced or under construction is never merged into what is running.
118
Facilities
43
Cities
81
Facilities in service
32
Facilities announced or building
Country view
118 facilities across 43 cities. Divisions are shaded by the number of facilities recorded in each.
Bubbles are placed at the city centroid, not at a facility address: the catalogue releases location at city granularity. Bubbles with a solid edge are sized from reported capacity; those with a dashed edge from a figure derived off the facility’s own reported dimensions. A derived figure sizes a bubble and nothing else — it enters no total, ranking, or statistic anywhere on this site. Planned capacity is not operating capacity. The map plots 8,944 facilities across 3,987 cities; a campus is plotted once, at the campus. Division shading covers the 17 of 118 facilities whose recorded region matches a division name. An unshaded division means the catalogue records no matching region for its facilities, not that it holds none — every facility is still plotted by city.
By facility count: 81 in service, 14 under construction, 18 planned, 5 stage not specified. 45 of the 118 report a capacity figure. Country capacity totals are published for the ten largest markets by capacity in service.
12 cities hold 3 or more catalogued facilities or a published capacity. A further 16 facilities sit in 13 locations with one or two each, all on the map above. 11 facilities have no published city.
| City | Facilities | In service | Building or planned | Reported capacity |
|---|---|---|---|---|
| Cyberjaya, Selangor | 32 | 28 | 3 | — |
| Gelang Patah | 9 | 0 | 7 | 663 MW |
| Kuala Lumpur, Wp Kuala Lumpur | 9 | 8 | 1 | — |
| Kulai | 8 | 4 | 3 | — |
| Johor Bahru, Johor | 6 | 5 | 1 | — |
| Johor | 6 | 5 | 1 | — |
| Shah Alam | 6 | 6 | 0 | — |
| Iskandar Puteri | 4 | 3 | 1 | — |
| Petaling Jaya, Selangor | 4 | 4 | 0 | — |
| Pasir Gudang | 3 | 0 | 3 | 440 MW |
| Bukit Jalil | 3 | 1 | 2 | — |
| Port Dickson | 1 | 0 | 1 | 700 MW |
Reported capacity is shown for the cities whose figures the release publishes; a dash means the city’s capacity is not published here, not that it has none.
Free sample records
One of the ten free sample records is here, shown with retained supporting links where available.
Princeton Digital Group · Bukit Batu, Malaysia
operating
+1 more attribute on this record