Europe · rank 4 by capacity in service

Data centers in Ireland

69 facilities across 33 cities and 32 operators, with 2.3 GW in service. Every value comes from a named public page, and capacity that is announced or under construction is never merged into what is running.

69

Facilities

33

Cities

2.3 GW

In service

2 GW

Announced or building

Country view

Ireland

69 facilities across 33 cities. Divisions are shaded by the number of facilities recorded in each.

DonegalLeitrimCavanMonaghanLouthDublinDún Laoghaire–RathdownWicklowWexfordKilkennyWaterfordCorkCorkKerryLimerickClareGalwayGalwayMayoSligoMeathFingalKildareCarlowLaoighisSouth DublinOffalyWestmeathLongfordRoscommonNorth TipperarySouth TipperaryWaterfordLimerickBallycoolin, Ireland: 6 facilities; 5 with reported capacityDublin, Dublin, Ireland: 2 facilitiesDublin, Ireland: 21 facilities; 1.5 GW reported; 1.5 GW in service; 8 MW under construction; 60 MW plannedArklow, Ireland: 2 facilities; 1.3 GW reported; 0 MW in service; 500 MW under construction; 800 MW planned
Reported city power
1 GW and above
200 MW – 1 GW
50 – 200 MW
10 – 50 MW
under 10 MW
How a bubble is drawnReported, coloured by stage:
In serviceUnder constructionPlannedStage not specified
Dashed edge: sized from a derived figure, not a reported oneSmall dot: city located and counted17 cities shown

Bubbles are placed at the city centroid, not at a facility address: the catalogue releases location at city granularity. Bubbles with a solid edge are sized from reported capacity; those with a dashed edge from a figure derived off the facility’s own reported dimensions. A derived figure sizes a bubble and nothing else — it enters no total, ranking, or statistic anywhere on this site. Planned capacity is not operating capacity. The map plots 8,944 facilities across 3,987 cities; a campus is plotted once, at the campus. Division shading covers the 2 of 69 facilities whose recorded region matches a division name. An unshaded division means the catalogue records no matching region for its facilities, not that it holds none — every facility is still plotted by city.

By development stage

2.3 GW
In service
666 MW
Under construction
1.4 GW
Planned
0 MW
Stage not specified

By facility count: 48 in service, 6 under construction, 15 planned. 42 of the 69 report a capacity figure.

Data center cities in Ireland

3 cities hold 3 or more catalogued facilities or a published capacity. A further 14 facilities sit in 13 locations with one or two each, all on the map above. 24 facilities have no published city.

CityFacilitiesIn serviceBuilding or plannedReported capacity
Dublin231941.5 GW
Ballycoolin651—
Arklow2021.3 GW

Reported capacity is shown for the cities whose figures the release publishes; a dash means the city’s capacity is not published here, not that it has none.