Skip to main content

Free preview example

Bulk Data Centers - N01 Campus

Bulk Infrastructure · Ovrebo, Norway · operating

Available facility facts are shown with one primary public reference. A blank value means it is not available in this release; it does not mean zero.

Facility power

Facility power
400 MW

Power density

Rack power density
100 kW per rack
Area power density
104.6 W/sf

Scale

Building area
3,550 m²
White space
1,500 m²
Racks
1,152

Operations

Cooling
air
Liquid cooling
yes
PUE
1.2
Renewable energy
yes

AI hardware

Accelerators
NVIDIA GB200 NVL72

Primary source

https://bulkinfrastructure.com/data-centers/locations/n01

Accessed 2026-07-08. This is the main public reference for the facility and may not support every individual attribute.