Bulk Infrastructure · Ovrebo, Norway
operating
- Facility power
- 400 MW
- PUE
- 1.2
- Cooling
- air
- Liquid cooling
- yes
- Accelerator
- NVIDIA GB200 NVL72
- Renewable energy
- yes
+6 more attributes on this record
Provenance Data Hub
10,005 facilities across 169 countries and 4,525 cities, each facility carrying the public page that identifies it and the date it was read. Capacity is held apart by development stage, so what is in service is never mixed with what is announced, and the table is re-read against its sources every month.
Facility map
Every city holding a catalogued facility is plotted, sized by capacity where the catalogue has one. Solid bubbles carry reported figures; dashed bubbles are derived from the facility’s own size, for the three fifths of the inventory that reports no power value.
Facilities per country
Bubbles are placed at the city centroid, not at a facility address: the catalogue releases location at city granularity. Bubbles with a solid edge are sized from reported capacity; those with a dashed edge from a figure derived off the facility’s own reported dimensions. A derived figure sizes a bubble and nothing else — it enters no total, ranking, or statistic anywhere on this site. Planned capacity is not operating capacity. The map plots 8,944 facilities across 3,987 cities; a campus is plotted once, at the campus. The facility-level records behind all 8,944 facilities on this map are available as a CSV on request.
Development status
Reported facility power split by development stage, ordered by certainty.
Announced and under-construction capacity is never merged into the in-service figure. Facilities with no reported power value are excluded entirely.
Free country view
Ranked by power in service. Announced capacity is listed separately.
Bars are scaled to the largest in-service value in this panel. Announced capacity carries more uncertainty than capacity in service and is never added into the ranking.
Company comparison
Ranked by power in service. Announced capacity is listed separately.
Bars are scaled to the largest in-service value in this panel. Announced capacity carries more uncertainty than capacity in service and is never added into the ranking.
Source library
Who publishes the cited primary documents
Counts of distinct pages and documents after duplicates are removed. Screened and read describe what was looked at, not what was adopted. Publisher types are grouped by the publishing domain and are not a ranking.
Kept current
Each release is compared with the one before it; the planned and building projects it holds are watched for a stage change, and every source check is counted whether or not it changed the table.
Free preview
Three of the ten free sample records, each showing only the attributes its sources actually state. Blanks are absent rather than printed.
Bulk Infrastructure · Ovrebo, Norway
operating
+6 more attributes on this record
atNorth · Kista, Sweden
operating
+5 more attributes on this record
Crusoe Cloud · Abilene, Texas, United States
operating
+3 more attributes on this record